eco logical

“UNGERS was able to engage the berlin-based institut für bau-, umwelt-und solartechnik (institute for building, environmental and solar technology) for the energy concept of the building. UNGERS approached the assignment with a particular position. in his opinion, the energy efficiency of the design should not depend on construction and building technology, but should be understood as an architectural problem, anContinue reading “eco logical”

the same story told 9 times over 4 years

Grade is marked down due to consistently arriving to class late, submitting work late, sleeping in class, not following formatting instructions, not following assignment of Material Phases closely. Avril produces very coherent and interesting work but needs to respect the time of her peers and the requirements of the course. This will ultimately elevate theContinue reading “the same story told 9 times over 4 years”